Messah, Y. A., Berelaku, D. C. S. and Ramang, R. (2023) “PERBANDINGAN PENAMBAHAN WAKTU KERJA DAN PENAMBAHAN TENAGA KERJA TERHADAP BIAYA PELAKSANAAN PROYEK”, Jurnal Teknik Sipil, 12(2), pp. 215-228. Available at: https://sipil.ejournal.web.id/index.php/jts/article/view/869 (Accessed: 19April2025).