Messah, Y. A., Lona, L. H. P., & Sina, D. A. T. (2013). PENGENDALIAN WAKTU DAN BIAYA PEKERJAAN KONSTRUKSI SEBAGAI DAMPAK DARI PERUBAHAN DESAIN. Jurnal Teknik Sipil, 2(2), 121-132. https://doi.org/10.35508/jts.2.2.121-132