[1]
Messah, Y.A., Lona, L.H.P. and Sina, D.A.T. 2013. PENGENDALIAN WAKTU DAN BIAYA PEKERJAAN KONSTRUKSI SEBAGAI DAMPAK DARI PERUBAHAN DESAIN. Jurnal Teknik Sipil. 2, 2 (Sep. 2013), 121-132. DOI:https://doi.org/10.35508/jts.2.2.121-132.