[1]
Ramang, R., Frans, J.H. and Djahamouw, P.D.K. 2017. FAKTOR-FAKTOR KETERLAMBATAN PROYEK JALAN RAYA DI KOTA KUPANG BERDASARKAN PERSEPSI STAKEHOLDER. Jurnal Teknik Sipil. 6, 1 (Apr. 2017), 103-116. DOI:https://doi.org/10.35508/jts.6.1.103-116.